Installation and Connections / Instalaci
1.
Install valve body and plumbing, figure 1.Note:
Face of plasterguard (1) should be flush
with finish wall line.
Instale el cuerpo de la
válvula y el fontanería, figura 1. Nota: Manguito protectorial (1)
debe estar al ras con la pared.
按照图1安装阀体和管道。注意:
保护套 (1) 应与墙面平齐.
및배관.
보호 슬리브
주의:
1A.
1B.
1
1 5/8"
(42 mm)
1"
(25 mm)
4 1/8"
(105 mm)
4 1/8"
(105 mm)
Hole Size
Tamaño de Agujero
钻孔尺寸
홀사이즈
2D.
2E.
G 1/2 -
ISO228/1
0~7/16"
(0mm~10mm)
88755
Rev. C
ón y conesiones /
安装和连接 /설치 및 연결을
Install trim figure 2.
2.
Instale la guarnici
按照图2安装明处部分。
(1)
커버 벽면과 일치할것.
2A.
2B.
2C.
Check for correct operation, figure 3.
3.
Pruebe si funciona correctamente, figura 3.
按照图3检查龙头工作是否正常。
3A.
3B.
3C.
2
ón, figura 2.
3D.
Parts / Piezas / 零件图 / 부품
ISH11006
RP91046
Maintenance / Mantenimiento / 维护 / 유지
4.
Replace the ceramic cartridge, figure 4.
按照图4更换阀门系统。
3E.
4.
RP46872
RP48332
RP40709
RP76212
RP76213
RP91051
RP46866
3
4
4
RP46868
ITS61340
RP36445
RP91049
RP72944
88755
Rev. C