RECEIVING THE UNIT
When you receive the unit, unpack it checking that the packaging is intact. Inspect it and make sure nothing is missing.
In addition to the unit, y
- One bag containing the anchor bracke
on the machine's chassis. This includes 8 M5 cross-head bolts t
- Another bag with the differential pressure switch, the transparent pressure tube and the 2 thread/sheet bolts f
- An individual absolut
The unit is a Plug&Play device, meaning that you do not need t
We recommend that you open the access panel to check that nothing has moved during transport, making sure
that the pr
r, the GRSystem and t
The access panel is opened by removing the 8 M6 Allen bolts (4 on each side), with it being important
to retighten them correctly to ensure the seal of the unit.
The unit starts up automatically when powered up.*
Before starting it up, all of the unit's access panels must be closed.
Keep the start-up switch in the stop position and connect the unit.
Connect the main external power switch to the unit, keeping its start-up switch in the stop position. Once this has
been done, check that the voltage on the unit's electrical input terminals matches the voltage indicated on the
nameplate (the minimum permitted voltage will be 10% less than the nominal voltage indicated on the nameplate).
Check that the earth connection is connected correctly.
Once all these checks have been done, remove the unit's stop position (switch it ON).
The fan will not start if the duct network is not completely closed, as the connection of the fan without load can cause
overcurrents that could damage the motor.
(*) See in the user manual the different types of connection. The setting of the pressure switches is:
Without ducts
AIR PRO 100
200
AIR PRO 300
240
EMERGENCY OPERATIONS
If you notice any problem on the unit, switch it off using the emergency stop device.
These emergency operations will generally be due to a problem with the electrical circuit, in which case there will be
problems with the motors. You will therefore need to disconnect the power in order to locate the fault, which may be
inside the unit (short circuits, etc.) or external to the unit (power supply issues, voltage variations, etc.).
In the ev
re, it must be extinguished using suitable extinguishers.
rackets supplied unassembled, for installation in situ
st cer
re corr
50 Pa
100 Pa
178
154
220
186
the unit to the desired surface.
re anything.
xed in place.