Descargar Imprimir esta página

ZIGOR ZGR SOLAR STR 250 Manual De Operación página 85

Publicidad

Idiomas disponibles

Idiomas disponibles

ZGR SOLAR STR 250
6) Remove the AC junction box, ensure that the AC wiring terminals are voltage-free via a multimeter, and
remove the AC wires.
7) Install the MC4 waterproof plugs and AC waterproof cover.
4.6.2 Dismantling the inverter
WARNING
Risk of burn injuries and electric shock!
Do not touch any inner live parts until at least 5 minutes after disconnecting the inverter from the utility
grid and the PV input.
1) Refer to 4.4.3 Electrical installation for the inverter disconnection of all cables in reverse steps.
2) Dismantle the inverter referring to 4.2 Mechanical installation in reverse steps.
3) If necessary, remove the wall-mounting bracket from the wall.
4) If the inverter will be reinstalled in the future, please refer to 1.2 Storage precautions for a proper
conservation.
4.6.3 Disposal of the inverter
Users take the responsibility for the disposal of the inverter.
NOTICE
Some parts and devices of the inverter, such as the capacitors, may cause environmental pollution.
Do not dispose of the product together with household waste but in accordance with the disposal regulations
for electronic waste applicable at the installation site.
Operation manual
www.zigor.com
36

Publicidad

loading

Productos relacionados para ZIGOR ZGR SOLAR STR 250