5.2 START-UP
This section describes the power-up of the inverter with HMI operation, using the minimum
connections of
Figure 3.1 on page 17
Furthermore, two types of control will be considered: V/f control (scalar) and vector control
V V W. For further details on the utilization of these types of control refer to the CFW300
programming manual.
DANGER!
High voltages can be present, even after the disconnection of the power supply.
Wait at least 10 minutes for full discharge.
DANGER!
Des hautes tensions peuvent être présentes, même après la déconnexion de
l'alimentation. Attendez au moins 10 minutes pour une décharge.
First Time Power-Up and Start-Up
and without connections in the control terminals.
CFW300 | 29