Descargar Imprimir esta página

Bosch GNB18V-12 Instrucciones De Funcionamiento Y Seguridad página 19

Publicidad

Idiomas disponibles

Idiomas disponibles

Loading Single Shot Fasteners
(Fig . 2, 14)
Loading Instruction
Do not pull the trigger or de-
press the nosepiece when
loading the nailer . Pulling the trigger or de-
pressing the nosepiece may cause misfiring of
the tool resulting in personal injury and property
damage .
Load only one single shot
fastener at a time . Loading
multiple fasteners can cause misfiring and dam-
age the nailer .
1 . Remove the Battery Pack .
2 . Ensure that the Single Shot Magazine 14 is
free of debris, such as a build-up of concrete
dust .
3 . Install the Single Shot Nosepiece 15 and
the Single Shot Magazine 14 according to
instructions in the section "Removing and
Installing the Magazine and Nosepiece" .
4 . Position nailer onto a flat stable surface and
point the Nosepiece 15 away form yourself
and bystanders .
5 . Select and push a single shot fastener into
the Single Shot Nosepiece 15 as shown in
Fig 14 .
Note: Compatible single shot fasteners are
0 .300" (8mm) nominal diameter, as shown
in the "Specifications" table . The fastener
should slide easily into the Single Shot Nose-
piece 15 and not fall out .
1605A001CD GNB18V-12 202301.indd 19
Operation
Fig. 14
15
19
1/9/23 2:07 PM

Publicidad

loading