Descargar Imprimir esta página

cecotec ENERGYSILENCE 2000 COOL TOWER SMART Manual De Instrucciones página 39

Ocultar thumbs Ver también para ENERGYSILENCE 2000 COOL TOWER SMART:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 33
1. PARTS AND COMPONENTS
Fig. 1 (*)
1.
Control panel
2.
Air outlet
3.
Front part
4.
Water level control window
5.
Maintenance
6.
Power cord
7.
Back
8.
Handle
9.
Water tank screw
10. Rack/filter
11.
Rotating element
12.
Water tank
13.
Pump
14. Coolers
15.
Power cord
(*) The graphics in this manual are schematic representations and may not exactly match the
product.
2. BEFORE USE
-
Take the product out of the box. Remove all packaging material.
-
Save the original box.
-
Make sure all parts and components are included and in good conditions. If any visible
signs of damage are observed, contact the Cecotec official Technical Support Service
immediately.
3. PRODUCT ASSEMBLY
-
The air cooler is divided into 2 parts. Put them together making sure that they match
properly and ensure they are tightly fixed. Fig. 2
-
Fix the base to the lower part of the air cooler main body.
-
Use the 4 screws provided to screw the base to the air cooler main body. Fig. 3
-
Fix it with two side screws.
-
Place the device on a stable and level surface.
E N E R GYS I L E N C E 2000 COOL TOWER SMART
ENGLISH
39

Publicidad

loading

Este manual también es adecuado para:

05289