Machine Maintenance; Daily Maintenance; Monthly Maintenance; Every 250 Hours Of Operation - Tennant NOBLES EX-SPOT-2 Manual Del Operario

Extractor portátil de alfombras
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

MACHINE MAINTENANCE

To keep machine in good working condition, simply
follow machine's recommended maintenance
procedures.
WARNING: Unplug Power Cord Before
Servicing Machine.
FOR SAFETY: All repairs must be performed by a
qualified service person.

DAILY MAINTENANCE

1. Clean machine with a nonabrasive, nonsolvent
cleaner.
2. Rinse out tanks thoroughly.
3. Remove and clean vacuum filter.
4. Inspect cord and cord grip for damage. Replace
immediately if damaged. Coil cord neatly after each
use.
5. Inspect vacuum hose for holes and loose cuffs.

MONTHLY MAINTENANCE

Flush pump system with acetic acid solution to dissolve
normal alkaline chemical buildup.
FOR SAFETY: When using machine, follow mixing
and handling instructions on chemical containers.
a. Mix .5L (16 oz) of acetic acid solution in
solution tank with 7.5L (2 gal) of hot water,
60 C (140 F) maximum.
b. Turn on machine.
c. Connect hand tool and press trigger on tool
until acetic acid solution begins to spray
through tips. Spray solution into a bucket.
d. Allow solution to remain in system for up to 6
hours in above freezing temperatures.
e. Later, spray out solution into a bucket. Then
run two gallons of clean water through system
to flush out impurities.
EX- SPOT- 2 / EX- SPOT- 8 (06- 19)

EVERY 250 HOURS OF OPERATION

Check vacuum motor for carbon brush wear. Replace
brushes if worn to a length of 10mm (0.38 in) or less.
Contact an Authorized Service Center for motor
maintenance.

STORING MACHINE

1. Before storing machine, be certain to flush tanks
and drain machine of all water.
2. Store machine in a dry area in the upright position.
WARNING: Do Not Use Outdoors. Do Not
Expose To Rain. Store Indoors.

STORING MACHINE IN FREEZING TEMPERATURES

Be sure that machine, pump and spraying system are
completely drained and dry. Pour undiluted antifreeze
into solution tank and cycle it through plumbing system.
OPERATION
EN
7

Publicidad

Tabla de contenido
loading

Tabla de contenido