Descargar Imprimir esta página

SICK GTB20 Manual De Instrucciones página 27

Ocultar thumbs Ver también para GTB20:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 39
8026846.1GXN/2022-11-05 | SICK
Subject to change without notice
2.
Lead voltage-free supply cable through the 3/8" MPT (Male Pipe Thread) fitting,
spacer, rubber seal (as illustrated below) and the back cover opening in the right
position horizontally or vertically.
3.
Tighten the 3/8" MPT (Male Pipe Thread) according to
4.
Connect and secure each of the wires to the terminal block with a torque of 0.4 to
0.5 Nm
(table
8).
5.
Put the back cover back. Ensure the back cover is free of obstruction and securely
tightened.
6.
Tighten the M3 screw with a torque of 0.6 to 0.8 Nm.
7.
Seal the other opening with the plastic nut (with rubber) provided in the package.
A
ØB
C
Table 3: Connection values, 1
L (A)
1
2
3
4
5
Table 4: Connection values, 2
C
1 (PVC)
1 (PUR)
2 (PVC/PUR)
3 (PVC/PUR)
Only apply voltage and switch on the voltage supply once all electrical connections have
been established.
1
46 mm
41 mm
31 mm
26 mm
21 mm
Ø B [mm]
5.8 ... 6.7
5.8 ... 6.7
6.8 ... 7.7
7.8 ... 8.2
O P E R A T I N G I N S T R U C T I O N S | GTB20
OPERATING INSTRUCTIONS
table 3
and
table
4.
1
2
2
57 mm
52 mm
42 mm
37 mm
32 mm
Torque [Nm]
1.3 ... 1.5
1.5 ... 1.7
1.7 ... 2.0
1.7 ... 2.0
en
3
27

Publicidad

loading