Descargar Imprimir esta página

GreenWorks Commercial 7504802 Manual Del Operador página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

Left
retention
pin
Attachment slot
③ Connect right retention pin to the right attachment slot.
Attachment
slot
Right retention pin
3. Lift the top cover assembly above the posts and lower it
so that the upper tips of the posts are inserted into the top
cover assembly.
English
Top cover
4. Install both bagger assemblies onto the top cover
assembly by inserting the front edge in first, and then
setting the back edge down until it fits into the assembly.
Back edge
Front edge
Bagger
5. Stretch the rubber buckle until it is hooked onto the upper
chute tube.
Buckle
7
EN

Publicidad

loading