Descargar Imprimir esta página

GreenWorks Commercial 7504802 Manual Del Operador página 8

Publicidad

Idiomas disponibles

Idiomas disponibles

EN
6. Insert the top of the upper chute tube assembly into the
top cover assembly.
7. With the bulge aligned with the notch, slide the upper
chute tube assembly into the lower chute tube assembly.
Stretch the rubber buckle until it is hooked onto the upper
chute tube.
Upper chute tube
Transparent
tube
Note: The transparent tube needs to be cleaned after use.
Rubber buckle
NOTE
English
8

Publicidad

loading