WIKA RLT-1000 Manual De Instrucciones página 13

Ocultar thumbs Ver también para RLT-1000:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Commissioning, operation
If the opening of the process connection is too small for the float, the
float must be removed before mounting.
- Before removal, mark the position of the float stop  with a
waterproof pen
- Mark the mounting position of the float (e.g. "Up")
- After the level sensor has been mounted, the float should be
re-attached within the inside of the tank (pay attention to the
mounting position!).
- Secure the float stop  again at the marked point.
WIKA operating instructions models RLT
≤ 30°
EN
13

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Rlt-2000Rlt-3000

Tabla de contenido