INSTALLATION
Typical Installation
1 Gas tight basin
2 Discharge
3 Union
4 Check valve
5
4
2
6
11
7
10
5 Gate valve
6 Intake
10 Pump
7 Air bleed hole
8 Basin vent
3
15
9 Basin cover
11 Caulking hub
INSTALLATION
Typical Installation
8
9
1
12
14
13
12 Tethered float switch
13 Off level
14 On level
15 Electrical connection minimum
4 ft (1.2 m) above floor level
See
"Electrical Connections" on
page
5.
3