Transport, Packaging And Storage; Commissioning, Operation - WIKA air2guide A2G-10 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

5. Transport, packaging ... / 6. Commissioning, operation

5. Transport, packaging and storage

5.1 Transport
Check the pressure gauge for any damage that may have been caused
by transport. Obvious damage must be reported immediately.
GB
5.2 Packaging
Do not remove packaging until just before mounting.
Keep the packaging as it will provide optimum protection during trans-
port (e.g. change in installation site, sending for repair).
5.3 Storage
Permissible conditions at the place of storage
Storage temperature: -30 ... +80 °C
Protect the instruments from moisture and dust.

6. Commissioning, operation

Installation and mechanical connection
In accordance with the general technical regulations for pressure
gauges (e.g. EN 837-2 "Selection and installation recommendations for
pressure gauges").
Process connection lower mount (LM) or back mount (BM)
Protect measuring instruments from contamination, high temperature
changes and vibrations
air2guide standard gauges are calibrated in vertical position and
should be installed in the same position to avoid loss of class
accuracy. If a different installation position is required please specify
when ordering. Gauges with high pressure ranges can be installed in
different non-vertical mounting position, by simply adjusting the zero
point.
8
WIKA operating instructions air2guide models A2G-10, A2G-15

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Air2guide a2g-15

Tabla de contenido