Descargar Imprimir esta página

Amplicomms DB 100plus Manual De Instrucciones página 12

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 36
A
T A GLANCE
1
Drying compartment
2
Battery Tester indicators
3
Battery Tester
4
Humidity selector "Low Humidity"/"Normal Humidity"/"High Humidity"
5
On/Off-button
6
"Drying in progress" indicator
7
Refresh-button
8
"Refresh" indicator
9
Power indicator
10 Magnetized area for battery parking during drying / refreshing cycle
Operation
Drying Cycle
1. Plug AC power adapter into the unit and also to your power socket.
Verify power indicator (9) is ON.
2. Set humidity selector (4) for the following drying times:
- "Low Humidity" (left position) = 2 hours
- "Normal Humidity" (central position) = 4 hours
- "High Humidity" (right position) = 8 hours
/ O
PERATION
Helpline UK 0844 800 6503
(See page 14 for costs and hours of operation)

Publicidad

loading