Transport, Packaging And Storage; Commissioning, Operation; Mounting Preparation - WIKA RLS-1000 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Transport ... / 5. Commissioning, operation

4. Transport, packaging and storage

4.1 Transport
Check the float switch for any damage that may have been caused by
transport. Obvious damage must be reported immediately.
CAUTION!
With improper transport, a high level of damage to property
can occur.
Observe the symbols on the packaging.
Handle packed goods with care.
4.2 Packaging and storage
Do not remove packaging until just before commissioning.
Permissible conditions at the place of storage:
Storage temperature: -30 ... +80 °C (-22 ... +176 °F)

5. Commissioning, operation

Observe all instructions given on the shipment packaging for
removing the transportation safety devices.
Remove the float switch carefully from the packaging!
When unpacking, check all components for any external damage.

5.1 Mounting preparation

Functional check
Before mounting, the float switch can be connected as
described in chapter 5.3 and the switch points can be
operated manually.
WARNING!
Ensure that the functional check does not start any
unintended processes.
WIKA operating instructions models RLS
EN
11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Rls-2000Rls-3000Rls-5000Rls-6000

Tabla de contenido