Descargar Imprimir esta página

Kohler K-26070-LA-0 Instrucciones De Instalación página 8

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Secure the Flange
Place a clean drop cloth in the bath basin to protect the surface.
Drill a small pilot hole through the nailing-in flange at each stud. Add shims as needed.
Nail 1/4" (6 mm) thick furring strips to the studs, flush with the nailing-in flange.
Use #6 large-head galvanized nails or screws to secure the nailing-in flange to the studs.
1499222-2-A
Stud
Galvanized Nails
Furring Strips
8
Kohler Co.

Publicidad

loading