Descargar Imprimir esta página

Lincar 135GN Manual Del Usuario página 35

Publicidad

Idiomas disponibles

Idiomas disponibles

Couver Open
Fig.7
Successively with appropriate equipments (brush, shovel, exhaust fan,...) You must to
remove the deposited bunching. After to have executed the cleaning, reassemble the
pieces to execute a correct assemblage of the parts.
NB: In phase of re-assemble please care attention to the guideline of the folds of the
oven plane during the insertion. (Fig. 8)
It is lively advised to execute a checking and eventually the Cleaning of the gas flue
of drainage between appliance and the flue.
IT IT IT IT- - - - G G G G B B B B - - - - FR
FR- - - - ES
ES mod. 135GN-135GNV-145GN-145GNV
FR
FR
ES
ES
Plate
Components to clean
35/76
Small plate
Oven plane
Fig. 8 oven:
The folds of the plane must be
placed as indicated in the picture
directed to high.
Fig. 8

Publicidad

loading

Este manual también es adecuado para:

145gn135gnv145gnv