Descargar Imprimir esta página

Kohler K-7309 Guia De Instalacion página 6

Ocultar thumbs Ver también para K-7309:

Publicidad

Idiomas disponibles

Idiomas disponibles

Stop
Adjustment
4. Installation Checkout
Ensure that all connections are tight.
Open the drain.
Turn on the main water supply.
Slide the key provided onto each cold and hot stop adjustment.
Turn counterclockwise to open.
Open both hot and cold valves.
Run water through the spout for approximately one minute to
remove debris. Check for leaks.
113700-2-AB
Stop
Adjustment
Key
6
Kohler Co.

Publicidad

loading