Installation Preparation - GE DBVH510 Manual Del Propietário

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Stacking.
KIT CONTENTS
Right Hand Bracket
Left Hand Bracket
TOOLS YOU WILL NEED
Phillips Screwdriver
Open-Ended Wrench

INSTALLATION PREPARATION

Remove the packaging.
Flatten the product carton to use as a pad to lay
the dryer down on its side. Continue using the
carton to protect the finished floor in front of
the installation location.
20
4 Rubber Pads
Pliers
4 #12 x 1" Screws
4 #8 x 1/2" Screws
Gloves
Level

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Dbvh512Dcvh515Dcvh660Dhdvh52Dhdvh66

Tabla de contenido