Installation
1. Install the finished surface, ensuring the finished surface is in accordance with the
minimum and maximum installation depths shown on the drawings in the front of this
booklet.
2. Remove the thread covers (R).
Important note: The instructions show the "LA" lever option, the assembly method
and set up are the same for the "LB", "R", "CCR" and "CBR" handle options