Descargar Imprimir esta página

Desoutter PT070-T6000-I13S Manual De Instrucciones página 55

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 14
Inspection and lubrication of pulse unit
(R)
Make sure that the
O-ring's groove is clean
To fill the pulse unit with oil
Due to a possible microleakage of oil from the pulse unit, it could be necessary to refill the
unit between the regular overhaul intervals. The frequency of this procedure depends on
the type of application, number of cycles, tightening time etc. An indication of not enough
oil is a decreased tightening torque and an increased pulse frequency. (See "Test after ser-
vice")
After disassembly of pulse unit, fill with oil according to operation No. 1-3 below. Run
the machine in a vice for 10 seconds according to operation No. 5 below. Then continue
according to operation No. 6-11. For best performance use Hydraulic Oil 22 cST/40° C
(ISO VG22).
Oil : 22 cSt / 40 ˚C (ISO VG22)
1
(R) = To be replaced
(R)
3
2
Screw to stop
at every overhaul
(R)
2 Nm
2.5 mm
4
Fill full
Part no
2050505713
Issue no
4
Series no
C
Date
2015-03
Page
55
Note
Use grease of type
ALMAGARD 3752
or equivalent
6 – 7 Bar
5
Ca 10 Sec.

Publicidad

loading

Este manual también es adecuado para:

2051474694