STEP 5- LIFT AND HANG THE MONITOR PLATE AT THE PIPE ASSEMBLY.
a) Rotate handle clockwise as far as
possible.
b) Pull handle to side laterally
(against spring tension) and rotate
counter-clockwise as far as possible.
c) Repeat steps a) and b) until TV
holds desired tilt.
A4
A5
and
Secure Acorn Nut
and Washer on
Monitor Plate to Pipe
Assemble (snug
tension only)
A4
Allen Wrench
A5
M6 Washer
A6
M6 Acorn Nut
A6
P10