Descargar Imprimir esta página

Qlima R 8128S C-2 Manual De Instrucciones página 89

Ocultar thumbs Ver también para R 8128S C-2:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 54
15
17
19
21
23
25
man_R8128SC-2 ('22) V2.indd 89
man_R8128SC-2 ('22) V2.indd 89
15. Raise the wick to its highest position and tighten the
wing nuts in several steps.
16
16. Check the wick height. It should be 5/16 above the collar.
17. Check for the correct clearance between wick holder
and draft tube. It should be the same all around.
18a. Reinstall the tip-over switch assembly by pushing the
extinguish knob .
18b. Connect the 3 connectors (3EA) with the circuit board.
18c. Remove the connector (1EA) from the ignitor.
18
19. Check the function of the tip-over safety stop by push-
ing the extinguish button  to upset the pendulum.
20. Reinstall the automatic ignition assembly.
21. Reinstall the wind cover A / B.
22. Reinstall the cabinet .
23. Tighten the 5 screws on the cabinet and reinstall the
20
sensor at the back of the cabinet .
24. Reinstall the combustion chamber 4 and the fuel tank
.
25. Reinstall the wick adjusting knob 2 and ignition
button 3. Close the front plate.
Install the batteries in the battery case and fill the fuel
22
tank with Qlima Premium Quality Fuels. Set the tank
into the heater and wait at least 180 minutes for the
new wick to fully saturate with the fuel.
24
4
89
89
09-03-2022 13:38
09-03-2022 13:38

Publicidad

loading