PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with
package contents list and hardware contents list. If any part is missing or damaged, do not
attempt to assemble the product.
Estimated Installation Time: 45 minutes (24 hours for silicone caulk to dry).
Tools Required for Installation (not included): Phillips screwdriver, utility knife or scissors,
silicone caulk, power drill with drill bit
Helpful Tools (not included): Measuring tape, level
NOTE: Your vanity comes with brushed nickel handles (BB) or champagne bronze handles (BB)
that are pre-installed of the cabinet. If you would like to change them, locate the included
brushed nickel handles (BB) or champagne bronze handles (BB).
INSTALLATION INSTRUCTIONS
1. Please remove the top (B) from the vanity (A). Place the top (B) and backsplash (C) face
down onto a scratch-free surface such as a foam sheet that came in the packaging.
1
B
1
A
All manuals and user guides at all-guides.com
1
4
3
3