Descargar Imprimir esta página

STA-RITE SC-75P Guia De Instalacion página 130

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 82
All manuals and user guides at all-guides.com
Mounting the Power Center Enclosure
1. remove the 4 screws securing the Power Center cover and remove the cover
2- Position the Power Center on a flat surface such as a wall or post and drill 4 holes through the plastic enclosure at the
specific locations with a small bit drill (must be lower than screw diameter) in order to mark the wall with each of the 4 screw
locations.
3- Drill 4 holes of 6mm at the marked locations, install anchors if necessary
4- Position the Power Center aligning the holes on Wall and in the Power Center
5- Install and tighten four mounting screws (the screws must enlarge the holes previously drilled in the power center so
that IP rating is maintained).
Wall Mounting area
Connecting the SC-75 Cell Cable to the Power Center
Connect the SC-75 cell power cable to the power center as follows:
1. IMPORTANT WARNING: Be sure that the Power Center AC power line is switched OFF before connecting the power
cord connector to the Power Center.
2. Align the SC-75 cell power cord connector with the socket on the bottom of the Power Center and insert the connector.
Rotate the round socket nut until it locks the connector in place.
Connector Socket Nut
To SC-75 Cell
6

Publicidad

loading