5. Prepare the pivot arm by placing one bushing on each side of the pivot
ball as shown. Insert the short end of the rod into the drain body and
through the eyelet hole in the plunger.
Fasten the pivot ball nut to secure.
6. Insert the drain lift rod
and pivot arm into the
drain lift rod connecting
part.
Tighten both rods with
screwdriver.
INSTALLATION PROCEDURE
Shorter End
6
Plunger Hole
Lever Hole
Bushings
Longer End
Drain
lift rod
Screw
Pivot
arm
Pivot Ball Nut
Pivot Arm
Drain lift rod
connecting part