Descargar Imprimir esta página

Samsung NK30K7000WS Guía De Instrucciones Para Instalación página 7

Ocultar thumbs Ver también para NK30K7000WS:

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Installation Instructions
Preparing the Location
We recommend you install the vent system before you install the
hood.
Before making cutouts, make sure there is proper clearance within
the ceiling or wall for the exhaust vent.
Check your ceiling height and the hood height maximum before you
select your hood.
1. Disconnect power.
2. Determine which venting method to use: roof or wall.
3. Select a flat surface for assembling the range hood.
Place a covering over that surface.
WARNING
TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR INJURY TO
PERSONS, OBSERVE THE FOLLOWING
4. Using 2 or more people, lift the range hood onto covered surface.
Range hood mountig screws installation
1. Determine and mark the centerline on the wall where the
canopy hood will be installed. Disconnect power.
2. Select a mounting height between a minimum of 24" (60.9 cm)
for an electric cooking surface, a minimum of 30" (76.2
cm) for a gas cooking surface, and a suggested maximum of
36" (91.4 cm) above the range to the bottom of the hood.
Mark a reference line on the wall.
3. Tape the template in place, aligning the template centerline and the
bottom of the template with the hood bottom line and with the
centerline marked on the wall.
A. Centerline
B. Fastener locations
C. Mounting height reference (hood bottom line)
4. Mark the fastener locations by pushing a pen or pencil tip through the
template into the wall.
IMPORTANT: All screws must be installed into wood. If there is no wood
to screw into, additional wall framing supports may be required.
5. Remove the template.
6. Drill
3
" (4.8 mm) pilot holes at all locations where screws are
16
being installed into wood.
7. Install the 2 - 5 x 45 mm mounting screws. Leave a
between the wall and the back of the screw head so you can slide the
range hood into place.
1⁄4"
(6.4 mm)
A
B
C
"(6.4 mm) gap
1
4
Vent cover bracket installation
1. Attach the vent cover bracket to the wall flush to the ceiling using
2 - 5 x 45 mm screws.
A
B
A. 8 x 40 mm drywall anchors
B. Centerline on wall
C. Vent cover support bracket
D. 5 x 45 mm screws
Complete Preparation
1. Determine and make all necessary cuts in the wall for the
vent system. Install the vent system before installing the
hood. See the "Venting Requirements" section.
2. Determine the required height for the home power supply
cable and drill a 1¼" (3.2 cm) hole at this location.
3. Run the home power supply cable according to the National
Electrical Code or CSA Standards and local codes and
ordinances. There must be enough wire from the fused disconnect
(or circuit breaker) box to make the connection in the hood's electrical
terminal box.
NOTE
Do not reconnect power until installation is complete.
4. Use caulk to seal all openings.
Installing the range hood
1. Using 2 or more people, hang the range hood on 2 mounting
screws by inserting the mounting screws through the mounting slots
on the back of the hood.
B
C
A. Mounting screws
B. Mounting slots
C. Lower mounting screws
2. Mark the lower mounting hole's location with a pencil.
3. Remove the hood assembly from the wall, and then drill
pilot holes at the marked locations.
4. Hang the range hood again on the 2 upper mounting screws.
5. Level the range hood and tighten the upper mounting screws.
6. Install the 2 - 5 x 45 mm lower mounting screws and tighten.
Use the optional wall anchors if needed.
C
D
A
" (4.8 mm)
3
16
English
7

Publicidad

loading