EN
STARTUP
4
STARTUP
Press the inlet valve inside the coating mate-
rial inlet (4) downwards before starting the
operation. This ensures that the valve is not
blocked or clogged.
4.1
UNIT WITH SUCTION SYSTEM
1. Ensure that the sealing surfaces of the connections are
clean.
Ensure that the red inlet (1) is inserted in the coating ma-
terial inlet (4).
2. Use the enclosed 41 mm wrench to screw the union nut
(2) at the suction hose (3) onto the coating material inlet
(4) and tighten it.
3. Screw the union nut (5) at the return hose (6) to the con-
nection (7) (22mm).
4.2
UNIT WITH UPPER HOPPER
1. Ensure that the sealing surfaces of the connections are
clean. Ensure that the red inlet (1) is inserted in the coat-
ing material inlet (4).
2. Screw the union nut (5) on the return pipe (6) onto the
connection (7).
3. Screw the upper hopper (8) onto the coating material in-
let (4).
6
5
7
36
3
2
1
4
4.3
HIGH PRESSURE HOSE AND SPRAY GUN
1. Screw the high pressure hose (9) onto the hose connec-
tion
2. Screw the spray gun (10) onto the high pressure hose
3. Tighten all union nuts on high pressure hose so that no
coating material can escape.
4. Screw the tip holder with the selected tip onto the spray
gun, align tip and tighten union nut.
When unscrewing the high pressure hose,
hold firmly on the hose connection with a
22mm wrench.
4.4
CONNECTION TO THE MAINS NETWORK
Connection must always be carried out via
an appropriately grounded safety outlet with
residual-current-operated circuit-breaker.
Before connecting the unit to the mains supply, ensure that
the line voltage matches that specified on the unit's rating
plate.
10
6
9
5
7
Super Finish 23 Pro
8
1
4
10
9