Peimar MIRUS LINE Manual De Usuario página 86

Inversor monofásico
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Note: the configuration of used Grid compliance must be done at the first power
on, before the inverter starts operating.
If users can not locate the corresponding country, please abort the setting and
contact Peimar assistance. An incorrect choice leads to malfunction of the device.
6.2.2 State
After set Grid compliance and the loading, inverter automatically displays its
operation status: Normal, Wait, Fault, Update.
Normal
Wait
Fault
Update
The inverter in normal (function) operation
The inverter in stand-by state
A fault occurs during operation
The state of updating firmware
86
EN

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Unicus lineGeminus line

Tabla de contenido