Unpacking; Connecting - Aqualytic AL125 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

1.
AL125
1.3

Unpacking

Carefully inspect all items to ensure that every part on the list below is present
and no visible damage has occurred during transportation.
Store the packing material to return the unit for repair or other kinds of transport.
The table below shows the parts included in the packing.
Part list
Part
1
Thermoreactor AL125
2
Power cord (European version)
3
Instruction manual
1.4

Connecting

On the reverse side of the reactor:
• Selector for voltage 115 V / 230 V
• Plug for power cord
• Fuse 4 AT
• ON/OFF Switch (0/I)
Before connecting to power supply check that the ON/OFF switch is turned to "0"
and check that the voltage selector (115 V/230 V) corresponds to the voltage
supplied by the electric socket.
Plug for power cord
AL125_4 05/2013
Fuse
Quantity
1
1
1
Cover
Selector
for voltage
ON/OFF Switch
17

Publicidad

Tabla de contenido
loading

Tabla de contenido