Descargar Imprimir esta página

SUHNER ABRASIVE LSA 70 Documentación Técnica página 13

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 16
3.1.1 c
/
hAnging
fitting the tool
Hold spindle with retaining pin and loosen or tighten the
union nut with wrench. Perform a trial run a minimum over
a period of 30 seconds without load.
3.2 w
orKing instructions
To achieve an optimum grinding result, move grinding
wheel uniformly back and forth with light pressure. Exces-
sive pressure lessens the working capability of the ma-
chine, as well as the life of the grinding wheel.
4. S
ervIce
4.1 P
reVentiVe mAintenAnce
Without a tool clamped in check no-load speed
periodically and after each maintenance. Even if
the machine still operates perfectly, the motor
should be removed, cleaned and the four slides checked
for wear by a specialist after approx. 300 to 400 operating
hours.
/m
aIntenance
13

Publicidad

loading