5. Commissioning, operation
Installation example for model GD-20-D
End piece
EN
5.2.2 Pin assignment (model GD-20-D)
Circular connector M12 x 1 (5-pin)
1
2
3
4
5
5.2.3 Requirements for shielding and grounding
Only use shielded cables and connect the shield on one side to the read-out unit.
■
The gas density sensor must be grounded via the process connection.
■
Ensure that no earth circuits can occur.
■
50
All manuals and user guides at all-guides.com
Y-connector
Sensors
-
-
U
Supply voltage
+
U
Mass
-
A
Signal RS-485
B
Signal RS-485
5 m cable
WIKA operating instructions gas density sensor, model GD-20
Gateway