Using The Appliance; Getting Started; Description Of The Control Panel - Essential ECAVD185-70b1 Instrucciones De Uso

Congelador vertical
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

using the appliance

Getting started

Before connecting the appliance to the mains for the first time, please allow the
appliance to stand for 2 hours, which will allow the refrigerant gas to stabilize
in the compressor. Failure to complete this step could damage the compressor.
Connect the appliance to the mains supply.
Wait at least 2 hours before filling the appliance with any food in order to ensure
the appropriate temperature has been reached inside the freezer.

Description of the control panel

1
2
3
4
5
6
7
8
9
10
11
12
V.1.0
using the appliance
53

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ecavd185-70v

Tabla de contenido