BOMBAS IDEAL CPH Serie Manual De Uso Y Mantenimiento página 27

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Bombas Ideal, S.A.
Pack both sides of bearing with grease.
Check that the bearing, shaft and housing are cleaned and undamaged.
Recharge with grease to a maximum of two thirds full.
Refit the bearing onto the shaft and press for tap into position.
11.4-Lubrication details
Initially bearings are lubricated during assembly. In the regreasing period these bearings should be
repacked with a high quality, lithium soap base, ball and roller bearing grease free from resin and acid,
not liable to harden or crumble and possessing rust preventive properties. The regreasing interval
depends upon the operating speed of the unit.
PUMP OPERATING SPEED
1450 RPM
2000 RPM
3000 RPM
To recharge the bearings with fresh grease use a grease gun through the two grease nipples provided.
DO NOT APPLY LUBRICANT WHEN PUMP IS RUNNING.
After 10,000 hours or two years whichever is earlier remove bearings from pumps, degrease, thoroughly
clean, recharge with fresh grease and refit in accordance with reassembly instructions.
11.5-Recommended grease specifications
Lubricant recommended
TEXACO
SHELL
KRAFT
BRUGAROLAS
11.6-Stuffing box details:
Champion Style – 3116 – Graphited cotton greasy packing is used in the standard supply. However
packing suitable for liquid handled is also supplied against specific requirement. Size of gland packings
and position of lantern ring
4000 hours
3000 hours
1000 hours
Regal Starfak Premium 3
Alvania-2
KL-2
Aguila 80
REGREASING INTERVAL
25

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido