5
5.1
IMPORTANT
• The Flow Control must never exceed the maximum admissible
• The Flow Control's screw fittings and plumbing connections must be
• The Flow Control must always be used in the vertical position!
• Fit a foot valve to the suction side of the pump.
• You must fit a pressure relief valve upstream to enable testing of the
• When metering aggressive chemicals check the resistance of the
Materials in contact with chemical
Housing: PVDF
Float:
Seals:
5.2
Plug the flow monitor connector into the "flow monitor" socket on the pump
(symbol
"Flow" now appears in the bottom left of the pump's LCD display. If not,
switch from OFF to ON in the FLOW-menu and set the number of permitted
failed strokes (the FLOW-menu is only accessible, if the connector is plugged
into the "flow monitor" socket).
®
ProMinent
Installation
Installation, hydraulic
operating pressure of 10 bar, irrespective of the operating status of the
system.
completely tight when in operation at maximum operating pressure!
Sediments in the Flow Control can obstruct the float.
Flow Control!
materials used (see ProMinent resistance list in the latest product
catalogue or at www.prominent.com)!
PTFE coating
FPM-B or EPDM (depending on order no.)
Screw the Flow Control directly onto the pump's discharge valve (the
control lever should be pointing towards the operator).
Installation, electric
).
Installation
19