Descargar Imprimir esta página

Termat TWO Serie Manual Del Usuario Y Del Instalador página 9

Publicidad

Idiomas disponibles

Idiomas disponibles

TERMAT TWOxxx_ES_EN_ver3_Julio'23
1.- BUILDING-IN.
The water heater shall be built-in as close as possible to the outlets in order to reduce the heat loses.
The building place must be chosen considering the maximum reductions of 90º elbows in water connections
and, at the same time, make easy the substitution of the heating element.
2.- APPLIANCE WALL HANG.
Due to its particular design, the TERMAT electrical water heaters could be installed in two positions as you
could see at fig-2:
1. Vertical. At this position cold water inlet pipe (F) is on the right side and hot water outlet pipe (C) on the left
side. The hydraulic safety valve supplied with the appliance must be installed at the inlet cold water pipe
(F)..
2. Horizontal with maintenance cover on left side. In this case inlet cold water pipe (F) will be placed every
time in the bottom pipe and hot water outlet pipe (C) in the upper part. The safety valve must be installed
in the bottom pipe
DIMENSIONS
MODELO
TWO050
WATER
CONNECTIONS
A
B
C
D
E
F
G
H
fig.-1 – Model TERMAT TWOxxx
TWO080
G1/2'
G1/2'
470
570
860
900
272
322
355
415
204
255
470
365
205
287
380
470
9
TWO100
G1/2'
570
1090
322
415
255
550
287
470

Publicidad

loading

Este manual también es adecuado para:

Two050Two080Two100