ENGLISH
1. Cut downpipe L10 to the ideal length according to your
needed situation
2. Please define a fixing place before fix J04 and J02,(see
fig.B) then fix J04 and JO2 on bottom of gutter LO3 with
Z01, using opening tool T01 to drill a hole on JO3 through
the existing hole of J02 (see fig. B)
3. Please apply silica gel before fix J01, JO2 and L10.
26
Parts
#
mm
Qty