GARANT GridLine laptop and battery charging cabinet
NOTICE
Wiring and pipes in wall
en
Damage to wiring and pipes.
» Check wall for sufficient load-bearing capacity before drilling.
» Use suitable drilling tools and materials.
» Use suitable protective equipment.
» Have trained personnel drill holes.
» Do not drill holes close to wiring or pipes.
ü Wall plugs and screws chosen to match wall.
ü Floor has sufficient load-bearing capacity.
1. Mark drilling spots through the holes in the cabinet's rear and move cabinet out of the way.
2. Drill holes in wall, insert wall plugs and screw cabinet to wall.
6. Assembly
CAUTION
Assembly work
Risk of crushing feet or hands when assembling and when closing drawers.
» Wear safety shoes and safety gloves.
» Ensure safe footing on clean, level surface.
» Do not assemble by yourself.
6.1. CABINET TO CABINET
C
ü Cabinets are of identical height and depth. Otherwise drill through cabinet wall.
1. Insert four M6×12 bolts through both side walls at top and bottom.
2. Screw on four M6 nuts from the other side.
6.2. INSERTING/MOVING STORAGE SHELF
CAUTION
Toppling shelves
Crush hazard and impact hazard for individual limbs.
» Make sure the shelf is in the correct position.
» The shelf must abut the rear of the cabinet, leaving no gap.
» The front edge of the shelf must not project beyond the shelf carrier.
D
1. Insert four shelf carriers per shelf at identical height in socket strip.
» Shelf carrier's hooks face downwards.
2. Set the shelf down on shelf carriers.
» The shelf must abut the rear of the cabinet leaving no gap, it must sit firmly on the shelf car-
rier. The front edge of the shelf must not project beyond the shelf carrier.
26
Instruction manual