Type SPC D/PID positioner
4.3.2
Electrical connection procedure:
1.
Connect the type SPC according to the tables. After applying the operating voltage, the SPC type is in operation.
2.
Now make the required basic settings and adjustments for the positioner/process controller. The procedure is described in
chapter " Putting into operation type SPC D".
NOTE!
Connect the Pt 100 sensor via 3 lines to compensate for the line resistance. Pin 3 and pin 4 must be bridged at the sensor.
4.3.3
Slide switch position
Distribution
Internally supplied
Externally supplied
NOTE!
The description EtherNet/IP, POFINET and Modbus TCP are described in separate chapters.
24
Assignment
GND Supply voltage
GND is galvanically isolated from the operating voltage
Operating Instructions
Slide switch
position
Left switch
Right switch