MANUAL DE USUARIO | USER'S GUIDE
2.
UNPACKING THE MACHINE
When unpacking your machine, you will find the
following accessories over the working and cup-
warmer trays:
•
1 drain flex hose
•
1 Stainless steel-flex hose
•
1 Blind filter
•
Installation card
•
This instruction manual with the CE
declaration of conformity, and so many
filter holders as the machine groups.
Be sure that these accessories are included.
Carefully remove the plastic cover of the
stainless-steel parts, and check if the machine
has suffered damages during its carriage.
3.
MACHINE PLACEMENT
•
The machine must be placed at the
optimum
position to be operated
without taking a forced posture.
•
When you have to decide the right place
for the machine, you must keep in mind
the needing of electrical supply, a net
intake and a drain outtake.
•
Leave a certain distance between the
machine and the walls both sides and
the back of the machine for air
circulation.
Do not install the machine:
•
In places exposed to the sun light, the
rain or where it may be hitted.
© LA ROCCA EXPRÉS S.A. | www.larocca.es
8
•
Near objects that can result damaged
because of the steam and heat emitted
by the machine.
4. PRELIMINARY INSTRUCTIONS
Before you start to install the machine, you must
be sure of the efficiency of the electrical and the
water net (if needed).
•
Connection to the water net (for models
without reservoir)
To connect the machine to the water net, you
must use the included hose. The water intake
of the machine is visible when removed the
working tray.
Water
inlet
Once made the connection, you must open the
main faucet. If loss of water is observed, tighten
again the nut of the hose.
The next connection to be done is the water-
drainage, by means of the flexible hosepipe,
that will have to be inserted in the collector
under the work tray, making sure that the hose
is anchored in the collector in order to avoid
water escapes. Once the pipe is connected you
must verify that it does not have any fold or
strangling that impedes the free water exit.
•
Connection to the Mains
Before connecting the espresso machine to the
mains, it is necessary to verify that tension and
frequency of the mains are equal to the machine
specifications.
It will have to adjust obligatorily to the valid
norm, as far as installation of thermal and
protection switches, the correct ground take,
etc.
Before starting with the operation of the
machine, verify that the general switch is in
0/OFF position and the group's switches are
deactivated.
Once all connections are concluded, fit the
height of the machine foot to keep it stable and
levelled.
5.
FIRST CONNECTION
All the JAVA Pro models are equipped with
automatic water load into boiler, independently
about if the dose is programmable or not. The
steps are the following ones:
Turn on the main switch
(9)
into position 2/Water
Load, and the machine will start loading water
into the boiler while the blue indicator will light.
If the load time is longer than two minutes (due
to small pressure in the water network), then
water load will stop and keyboard LEDs will start
blinking. Then take the main switch
for two seconds, and then turn on again.
If the level reached during first stage of the
water load were not sufficient, the machine will
continue loading water until the necessary level
is reached.
(9)
to 0/OFF