Descargar Imprimir esta página

Lithonia Lighting BGR ALO SWW2 MVOLT PER Instrucciones De Instalación página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

FIXTURE PACKING LIST
Description
A) Light Fixture ......................................................................... 1
B) Photocontrol* ....................................................................... 1
C) Conduit plug......................................................................... 1
D) 2" Lag Bolts* ........................................................................ 3
E) Set Screws ........................................................................... 2
F) Wire Nuts* ............................................................................ 3
G) Diff user* ............................................................................... 1
H)
Allen wrench* ............................................................... 1
3/16"
*Contained in parts packs
Mounting Hardware Included
Waterproof Supply Fittings, Conduit & Silicone Sealant
Required - Purchase Separately
REQUIRED TOOLS:
Remove fi xture components and parts pack. Check to ensure
all parts are included. Note: Account for small parts and destroy
packing material, as these may be hazardous to children.
Turn OFF Power at circuit breaker box!
CAUTION: Do not rely on wall switch alone to turn off power.
PHOTOCONTROL INSTALLATION
Align the arrow on top of the Photocontrol
with the arrow on the receptacle. Insert pins
and twist clockwise until it locks in place.
Note: Keep photocontrol or Shorting Cap installed to ensure that
no water will enter photocontrol receptacle.
SURFACE MOUNTING See Fig. A
Note: Hardware included for mounting to wood surfaces only!
Ensure that fi xture is mounted onto structurally sound surface that
will support the fi xture. Note: Use mounting Hardware appropriet
for your application!
1. For Surface mounting, remove conduit plug (C) and pull supply
wires through conduit hole.
2. Mark mounting hole locations using the template on the box
and drill 3/16" diameter pilot holes in wooden mounting surface.
3. Install two 2" Lag bolts (D) in bottom predrilled holes, leaving
about 3/8" space under the head.
4. Install the third 2" Lag bolt (D) into the predrilled hole on top
and back the Screw out. This will leave the hole threaded and
make installation easier.
5. Place Fixture Housing on the two bottom bolts, install third lag
bolt and tighten bolts to secure fi xture.
6. Make wire connections, push connections into arm and install
conduit.
Figure A
Quantity
Figure B
Photocell
Installation:
Align
"FACE NORTH"
arrow on top of
photocell with
white arrow on
receptacle
before
photocontrol
installation.
ARM MOUNTING See Fig. B.
Optional Mounting Arm (OMA) available (sold separately).
Follow Mounting arm instructions for mounting arm to surface.
Ensure that arm is mounted onto structurally sound surface that
will support the fi xture. Note: Use mounting Hardware appropriet
for your application!
1. Make wire connections and push mounting arm into the fi xture
arm hole making sure not to pinch any wires.
2. Tighten Set screws (E) with included Allen wrench (H) to secure
fi xture to arm.
page 3
INSTALLATION INSTRUCTIONS
B)
C)
A)
D)
E)

Publicidad

loading

Productos relacionados para Lithonia Lighting BGR ALO SWW2 MVOLT PER