Descargar Imprimir esta página

Operating - Quick SBC 300 ADV PLUS FR Manual Del Usuario

Ocultar thumbs Ver también para SBC 300 ADV PLUS FR:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

OPERATING

I GB
The position and description of the signals on the connector are listed below:
FEMALE CONNECTOR (DB 9)
PIN
DESCRIPTION
1
CAN BUS terminator (124 ohm)
2
CANL signal - CAN BUS interface
3
Battery charger negative
4
Not used
5
Earth
6
Not used
7
CANH signal - CAN BUS interface
8
Basic state of the battery charger (+V output, 20mA max)
9
+5Vdc (10 mA max)
BASIC STATE OF BATTERY CHARGER
PIN 8 CONNECTION
HIGH IMPEDENCE
+V OUTPUT
For a wiring example of control signals look at figure 3b.
CAN BUS NETWORK CONNECTION
When making the data interface connection (CANH and CANL signals) use an unscreened cable with a
twisted pair (cross-section 0.25/ 0.35 mm
The maximum total length of the data signal cable should be no more than 100 m.
Activate the terminator at the first and last device connected to the network.
If there is only one device, the terminator does not need to be activated.
An example of a network connection is given below:
SBC
ADVANCED
PLUS
20
STATE
OFF OR PROBLEMS PRESENT
ON OR NO PROBLEMS PRESENT
2
AWG 22/24, impedance 100/150 ohm).
*
TEMPERATUR
BATTERIES
SENSOR
*
CURRENT
SENSOR
TERMINAL
*
LCD
*
Optional devices.

Publicidad

loading

Este manual también es adecuado para:

Sbc 500 adv plus frSbc 700 adv plus frSbc 650 adv plus fr