3. Connect the two M12 connectors to the box and connect the
4. Connect the mains adapter (24 V) (4).
5. Switch on the instrument by pressing "On".
6. Repeatedly press the function button until the display shows
7. Press "Enter" to choose time measurement.
8. Repeatedly press the flank setting button until the display
9. Press "Enter". The display shows "Start ?".
10. Press "Enter" again to start measurement.
11. To start a new time measurement, press "Enter" to set the
Explanation
When the switch on the box is turned to "Start", a signal is sent to
the instrument and to the M12 "Start" connector. When the switch
is turned to "Return", a signal is sent to the M12 connector
"Return". The cylinder is sent to the starting position. For unistable
valves, only the "Start" connector is connected.
7.4.1
Only valid for VTM adjusted for NPN.
AVENTICS | VTM | R402002668-BDL-001-AC
cables to the pilot connections of the valve (3).
"Time".
shows two rising flanks (5).
instrument to standby for measurement.
Time measurement with NPN sensors
41
Instructions