Figure 4
Figure 5
Figure 6
Figure 7
Figure 8
PAGE 2 OF 6
ASSEMBLY INSTRUCTIONS CONTINUED
3"
5. Seal jugs by threading caps onto openings with
17-26 in-lbs of torque. (See Figure 4)
6. Place jugs into carton − bottom first. Finish side of the
jugs (caps) must be facing in. (See Figure 5)
NOTE: If shipping by air, jugs must be placed into
the included 1 mil poly bags. Poly bags must be
sealed with the included 5.5" 40# cable ties.
7.
Fold four small side flaps along dotted lines on top of
box. Tuck to form box top. (See Figure 6)
8. Fold two large side flaps along dotted lines on top of
box. Tuck into side flaps to complete box top.
(See Figure 7)
9. Seal top of carton down the center seam with one strip
of 2" wide (2.6 mil) polypropylene tape (Uline Model
# S-14564). The tape must extend 3" over each end of
the carton. (See Figure 8)
1-800-295-5510
uline.com
0221 IS-18286