Descargar Imprimir esta página

Eclipse Magnetics Ultralift E Serie Manual De Operación página 14

Imán de elevación

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 45
5 Periodic Inspection
If the Lifting Magnet is being used in the EU then it must be inspected and maintained in
accordance with the requirements of PUWER (1998).
For areas outside the EU the Lifting Magnet must be inspected and maintained in
compliance with the applicable work standards and other standards for suspended load
handling (eg. ASME B30.20).
Should the data plates become detached or damaged please contact your supplier
immediately for replacement plates.
In addition to statutory requirements it is recommend that you follow this maintenance
schedule:
MAINTENANCE SCHEDULE
Operation
Inspect pole feet for damage
Inspect lifting eye for damage and security
Inspect data labels for damage
Proof test WLL
6 Warranty
This Lifting Magnet is covered by a 1-year warranty from the date of invoice.
7 Inspection Record
This Lifting Magnet should be re-certified in accordance with the requirements of PUWER
(1998) and LOLER (1998).
For areas outside the EU this Lifting Magnet must be inspected in compliance with the
applicable work standards and other standards for suspended load handling (eg. ASME
B30.20).
12
Daily
Eclipse Magnetics. Innovative Magnetic Solutions
Frequency
Weekly
Monthly
Annually

Publicidad

loading

Este manual también es adecuado para:

Ule0100Ule0300Ule0600Ule1000