Permanent installation
Maintenance hatches should be provided with dimensions of at least 50 x 50 cm, ensuring
accessibility to technical components such as the pump, blower, valves, connection box, and
other connections. Preferably, employ removable side panels, but always prioritize rigid
elements.
Additionally, it is recommended to install 20 x 20 cm maintenance hatches for drainage/overflow,
ensuring proper noise insulation during installation.
For proper ventilation, the installation of a ventilation grill (not supplied) is absolutely necessary.
Depending on the bathtub model, position the ventilation grill in the wall lining near the units.
Inside the hatch, a ventilation grid (minimum 150 cm) can be fitted to supply air to the blower.
Alternatively, consider placing a maintenance hatch/ventilation grid in the adjacent room.
To optimize sound insulation, install the ventilation grid with soundproofing materials. It is also
acceptable to place the ventilation grid in the adjacent room, if suitable.
When space is limited:
is recommended to allow for the complete disassembly of the bathtub when necessary. Ensure
that the drainage pipe, electrical connections, and, if applicable, the water supply line can be
disconnected through the ventilation opening. Seal the entire perimeter of the bathtub rim with
silicone (acetic acid-free).
The bathtub should be placed on a surface that supports the water (e.g.tiles) and with a slight
drop to the outside, so that, in case of a possible leak or water falling in, it will come out under
the skirting and not accumulate under the bathtub. The guarantee does not cover water damage
caused by poor installation. It is recommended not to completely surround the whirlpool bathtub
with tiles. The water pump, air pump and ozone disinfection require air circulation.
Water should not be poured directly into the shower holder during use. The guarantee does not
cover water damage caused by misuse.
The internal components of the bath must be easily accessible, otherwise the warranty does not
cover access to the internal components in case of failure.
Checking for leakage
After connecting the water inlet and drain of the bathtub, it must be filled and checked for leaks.
Check the following functions using the control panel:
A. Air system
B. Water pump settings
Bathtub water temperature should not exceed 40 °C.
If there is insufficient room for a maintenance hatch, "surface mounting"
5