Descargar Imprimir esta página

Anselmo Cola AMBIENTE AC18 Instrucciones De Uso, Instalación Y Mantenimiento página 69

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

AMBIENTE AC18 - AC22
STANDARD HYDRAULIC COMPONENTS
1
3
2
Legenda
1
Membrane expansion tank
2
System drain cock 1/2"
3
Pressure relief valve
4
Delivery pipe with connections 1"
5
Hight efficiency circulating pump
6
Return pipe with connection 1"
Failure to wash the hydraulic system and introduce a suitable amount of
inhibitory liquid renders the unit's warranty null and void. Install shut-off valves
between the boiler and the heating system to isolate it from the system when
performing routine and/or extraordinary maintenance. Connect the boiler using
hoses to allow minor displacements and corrections during installation and
maintenance.
EN
9
4
5
7
6
8
cod. 484270040_07/20
7
Pressure transducer
8
System filling connection 1/2"
9
Boiler system air venting valve
69

Publicidad

loading

Productos relacionados para Anselmo Cola AMBIENTE AC18

Este manual también es adecuado para:

Ambiente ac22Ambiente ac27Ambiente ac34