Class I Division 2, Groups A, B, C, D; T4 Ta = 0°C to +50°C
12.
Description of Equipment:
General – The 4492 CPsingle and CPdouble peristaltic pumps are intended to discharge condensate from gas
analysis systems in commercial applications. The pumps consist of a pump head and drive motor and operate
on the peristaltic principle. The output axle of the gear motor turns a rotor on which two diametrically arranged
rollers press a hose against a dimensionally adapted hood and the continuous rotation displaces the contents of
the hose in the direction of rotation. The constructive selection of rotor speed and hose diameter also allow
minimal or larger amounts to be conveyed, depending on the viscosity of the medium to be pumped.
Construction - The pumps are provided with flying leads. As their physical configuration is not compatible with
Class I, Division 2 wiring methods, installation within a suitable final enclosure is required.
Ratings - The 4492 CPsingle and CPdouble peristaltic pumps operate at 115 Vac or 230 Vac, selectable by the
installer's wiring configuration. The pumps are rated for use in an ambient temperature range of 0°C to +50°C.
4492abcdefg, CPsingle and CPdouble condensate pumps
NI/I/2/ABCD/T4 0°C < Ta < 50°C
a = Condensate path; 1 or 2
b = Building version; 1 or 2
c = Voltage; 2
d = Application area; 2
e = Hose material; 1, 2 or 3
f = Liters/hour; 0, 1, 2 or 3
g = Hose connections; 1, 2, 3, 4, 5, 6, 7, 8 or 9
13.
Specific Conditions of Use:
1
4
1. The equipment shall be installed within a tool-secured enclosure in compliance with the enclosure,
mounting, spacing and segregation requirements of the ultimate application. The enclosure shall
be rated for a service temperature range of -20°C to 52°C.
2. Wiring shall be terminated within the enclosure using US-Listed terminal(s) rated for the marked
supply voltage and load current and a service temperature range of -20°C to 52°C.
14.
1
Test and Assessment Procedure and Conditions:
6
This Certificate has been issued in accordance with FM Approvals US Certification Requirements.
15.
Schedule Drawings
1
7
A copy of the technical documentation has been kept by FM Approvals.
THIS CERTIFICATE MAY ONLY BE REPRODUCED IN ITS ENTIRETY AND WITHOUT CHANGE
FM Approvals LLC. 1151 Boston-Providence Turnpike, Norwood, MA 02062 USA
T: +1 (1) 781 762 4300 F: +1 (1) 781 762 9375 E-mail:
F 347 (Mar 16)
SCHEDULE
US Certificate Of Conformity No: FM16US0070X
information@fmapprovals.com www.fmapprovals.com
Page 2 of 3