6
Installing the Weighing Platform
The connecting cable should be installed by a certified technician who has received spe-
cialized training from Sartorius.
!
Installation work that affects the IP67 protection rating must be performed with extreme
care.
!
Any installation work that does not conform to the instructions in this manual will result
in forfeiture of all claims under the manufacturer's warranty.
!
Always make sure the equipment is disconnected from power before performing any
installation, maintenance or repair work.
!
An IP67-protected cable gland is installed on the indicator at the factory.
§ To open the indicator, remove the four screws from the front panel and remove the panel.
§ Use the connecting cable from the weighing platform to connect the indicator.
!
The cable gland is installed at the factory. Please use extreme caution when performing
any work on the equipment that affects this cable gland. Use a torque wrench and
tighten the cable gland to 5 Nm.
§ Prepare and install the cable as follows:
– Route the cable through the cable gland.
– Close and tighten the cable gland in accordance with the applicable regulations.
– Remove the insulation from a section of the cable end (see illustration). The shielding (1)
must have contact with the clamps (2).
– Expose approx. 15 cm (6 inches) of the individually isolated wires (3) for installation.
– Route the cable through the cable gland.
– It is important to make sure that the shield is in contact with the clamps, because the
shield provides the ground connection for the cable.