Descargar Imprimir esta página

Kohler K-7167 Guia De Instalacion página 10

Desagüe de bañera
Ocultar thumbs Ver también para K-7167:

Publicidad

Idiomas disponibles

Idiomas disponibles

Toggle
7. Install the Stopper
Insert the drain stopper into the drain ell.
The drain stopper should rise approximately 3/8" (1 cm) above
the strainer. Adjust if needed.
If adjustment is required, remove the stopper and loosen the nut
below the stopper.
Raise the stopper by turning it counterclockwise, or lower by
turning it clockwise.
Tighten the nut.
If sufficient clearance cannot be obtained by adjusting the stopper,
remove the lift rod assembly.
Loosen the screw and slide the adjusting block up onto the
adjusting rail to increase clearance or down to decrease clearance.
Tighten the screw and insert the lift rod assembly back into the
overflow ell.
112035-2-AB
Stopper
Adjusting
Block
Nut
Adjusting
Rail
10
Lift Rod
Assembly
Screw
Kohler Co.

Publicidad

loading